Life Science Facilities: The Biggest Project Risks Usually Aren’t the Big Ones
Ask anyone who’s been through the design, construction, and startup of a GMP facility, and they’ll probably tell you the same thing:
Projects rarely get into trouble because of one major failure.
More often, it’s a collection of small issues that weren’t identified early enough. Individually, they don’t seem significant. Together, they create delays, rework, budget impacts, and frustration during commissioning and CQV.
Some of the most common examples include:
• Utility loads based on assumptions instead of actual process requirements
• Cleanroom pressurization and airflow considerations addressed too late
• Equipment layouts that make operation or maintenance more difficult
• Process flows that look efficient on paper but create challenges in day-to-day manufacturing
• Waste handling and neutralization systems that weren’t fully integrated into the overall design
• Space constraints that complicate future maintenance, calibration, or expansion
None of these issues are dramatic when they’re first introduced.
The problem is they often aren’t discovered until procurement has started, equipment has been ordered, or construction is already underway. At that point, even a small design change can have a ripple effect across the project.
That’s why successful life science projects begin with a deep understanding of the manufacturing process – not just the building.
The facility has to support the science, the people who operate it, and the regulatory requirements that govern it. If those elements aren’t considered together, problems eventually surface during startup, validation, or routine operations.
At Hart Design Group (HDG), we take a process-first approach to every life science facility we design.
That means we focus on:
• Understanding the manufacturing process before developing the facility layout
• Designing around real operational workflows—not assumptions
• Identifying constructability and operational risks early
• Making sure utilities, equipment, controls, and documentation all support qualification and long-term operation
A well-designed life science facility isn’t just one that can be built.
It’s one that can be commissioned efficiently, validated successfully, and operated reliably for years to come.